Arunachal Pradesh Energy Development Agency (APEDA)

1. Introduction about the Department

The Arunachal Pradesh Energy Development Agency (APEDA), Tawang District, is the Nodal Agency responsible for promoting, developing, and implementing renewable energy programmes and energy-efficient initiatives across the district. The department functions under the Government of Arunachal Pradesh with a mandate to enhance sustainable energy access, particularly in remote and rural areas where conventional power supply remains limited or challenging.

APEDA focuses on planning, executing, and monitoring various renewable energy projects such as solar power plant, solar street lighting, solar home lighting systems, high-mast lighting, and other decentralized energy solutions. The department also works closely with village authorities, government bodies, and partner agencies to expand clean energy infrastructure, improve public lighting, and support rural development through reliable energy access.

Through its ongoing efforts, APEDA aims to strengthen the district’s socio-economic development by promoting clean, affordable, and environment-friendly energy solutions, helping communities achieve improved living conditions and enhanced public services.

2. Organizational Structure & Staff details

Sl. No Details of Employees Designation Category of Employees
1 Shri Lobsang Chudup i/c Deputy Director Group-A
2 Shri Ngajum Tato Junior Engineer Group-B
3 Smti Sange Droima UDC Group-C
4 Shri Sangey Choita C/MTS C/MTS
5 Shri Sange Phuntso C/MTS C/MTS
6 Smti Tsering Drema C/MTS C/MTS
7 Smti Jambey Yangki C/MTS C/MTS
8 Shri Nawang Tsetim C/MTS C/MTS
9 Smti Tenzin Yuton C/MTS C/MTS

3. Scheme / Projects / Tenders / Services Offered

A. Schemes / Projects

Sl. No. Name of work Amount (Lakh) Remarks
1 Providing and Installation of Solar Street Lights 28 nos. at Thikshi in Tawang District. 13.00 Work in progress
2 Providing and Installation of Solar Street Lights 26 nos. at Jhamkhar in Tawang District. 12.00 –
3 Providing and Installation of Solar Street Lights 26 nos. at Sarong in Tawang District. 12.00 –
4 Providing and Installation of Solar Street Lights 20 nos. at Luguthang in Tawang District. 13.00 –

B. Tenders

All renewable energy projects with an estimated cost of ₹50 lakh or above are carried out through the tendering process, strictly in accordance with applicable Government rules and guidelines.

C. Services Offered

  • Implementation of renewable energy-based lighting systems, including solar street lights, Solar Home Lighting, and Solar High-Mast system.
  • Planning and execution of renewable energy projects in villages and remote areas.
  • Technical support for solar and other clean energy installations.
  • Monitoring, supervision, and reporting of state-sponsored renewable energy schemes.
  • Assistance to beneficiaries and local bodies in adopting and maintaining renewable energy solutions.

4. Office Contact Information & Officer Directory

Sl. No Details of Employees Designation Category of Employees Contact Details
1 Shri Lobsang Chudup i/c Deputy Director Group-A 7629964836 / 9436051265
2 Shri Ngajum Tato Junior Engineer Group-B 8131821353
3 Smti Sange Droima UDC Group-C 9862999957

5. Forms / Documents / Application Formats (if any)

If required, forms will be shared separately by the department.

6. Public Services / Beneficiary-related Information

  • Support to households and villages in applying for and adopting renewable energy systems, especially solar lighting and solar power plants.
  • Assistance to beneficiaries in understanding and accessing government renewable energy schemes.
  • Guidance to villages and local bodies on planning and proposing renewable energy projects, including solar power plant installations.
  • Facilitation of solar street lights, solar home lighting systems, solar power plants, and other clean energy solutions in rural and remote areas.

7. Achievements / Ongoing and Completed Projects

Sl. No. Name of Work Year of Sanction Name of Scheme Date of Commissioning Remarks
1 Installation of Solar Street Light (20 Nos.) for ITBP, BOPs and in mule track 2012-2013 BADP 08-08-2013 Handed over to ITBP
2 Installation of Solar Street Light (35 Nos.) for SSB, BOPs 2012-2013 – 08-08-2013 Handed over to SSB
3 Installation of Solar Home Lighting System (50 Nos.) for SSB, BOPs 2012-2013 – 08-08-2013 –
4 Installation of Solar Home Lighting System (20 Nos.) for SSB, BOP Bomja 2013-2014 – 28/07/2015 –
5 Installation of Solar Home Lighting System (20 Nos.) for SSB, BoP Kharung 2013-2014 – 28/07/2015 –
6 Installation of Solar Street Light (20 Nos.) for SSB, Ningsangla BOP. 2013-2014 – 28/07/2015 –
7 Installation of 28 Nos. Solar Home Lighting System (Model II) at 7 locations 2014-2015 – 31/07/2015 –
8 Installation 20 Nos. Solar Street light (Model II Solar Street Light at SSB, BOP Bomja 2014-2015 – 02/08/2015 –
9 Installation 20 Nos. Solar Street light (Model II Solar Street Light at SSB, BOP Kharung 2014-2015 BADP 08/08/2015 –
10 Providing and Fixing of 15 KWp Solar Power Plant at Lungur ITBP, Post 2014-2015 – 10/09/2015 Handed over to ITBP
11 Providing and Fixing of 5 KWp Solar Power Plant at Mago ITBP, Post 2014-2015 – 11/04/2016 –
12 Providing and installation of 5 KWp Solar Power Plant at Muchut (SSB) 2016-2017 – 21-05-2017 Handed over to SSB
13 Providing and installation of 5 KWp Solar Power Plant at Bletting (SSB) 2016-2017 – 02-06-2017 –
14 Providing and installation of 15 x Solar street light at Bumla Dome (Army) 2016-2017 BADP 24-06-2017 Handed over to Army
15 Providing and installation of 5 KWp Solar Power Plant at Muktur (SSB) 2016-2017 – 27-06-2017 Handed over to SSB
16 Providing and installation of 10 KWp Solar Power Plant at Lumla (SSB) 2016-2017 – 25-06-2017 –
17 Providing and installation of 5 KWp Solar Power Plant at BOP Zalim 2017-2018 BADP 07/12/2018 –
18 Providing and installation of 10 KWp Solar Power Plant at COY Hqr Dongsengmang 2017-2018 – 20/11/2018 –
19 Providing and installation of 5 KWp Solar Power Plant at BOP Bomja 2017-2018 – 03/12/2018 –
20 Providing and installation of 5 KWp Solar Power Plant at Chuna (Mago) 2017-2018 – 05/06/2019 –
21 Providing and installation of 5 KWp Solar Power Plant at Tse- La (Mago) 2017-2018 – 15/06/2019 –
22 Providing and installation of 5 KWp Solar Power Plant at Kalisam (Mago) 2017-2018 – 11/05/2019 –
23 Providing and installation of 5 KVA Solar Power Plant at BOP Khobleteng 2017-2018 – 13/12/2018 –
24 Installation and Commissioning of Solar Street Light (23 Nos.) and Solar Power Pack 2X1 KWp at Chuje GG Trout fish, Tawang 2017-2018 – 20/03/2019 –
25 Providing and installation of 1.5 KWp Solar Power Plant at SB Complex, Tawang 2017-2018 Deposit Work 20/03/2019 Handed over to Special Bureau, Tawang
26 Installation and Commissioning of Solar Street Light (25 Nos.) at Mago Village (Model Village) 2017-18 BADP 18/04/2019 –
27 Repair and maintenance of standalone Solar Power Plant 15 KWp at ITBP, BOP Lungur Tawang District 2017-2018 BADP 05/06/2019 Handed over to ITBP
28 Installation and commissioning of LED based Solar Street Light (75 nos) under NABARD Scheme in Tawang District 2018 NABARD 26/11/2018 to 30/12/2018 –
29 Installation and commissioning of LED based Solar Street Light (75 nos) under NABARD Scheme in Tawang District 2018 NABARD 26/11/2018 to 30/12/2018 –
30 Installation of Solar High Mast 07 locations in Tawang District 2020-21 – 10/01/2025 –
31 Supply and Installation of Solar Street Lights (900 Nos) in Tawang District 2019-20 RE 20/03/2020 to 03/02/2021 –
32 Supply and Installation of Solar Street Lights (1261 Nos) in Tawang 2022-23 RIDF 25/04/2023 to 28/08/2023 –
33 Supply and Installation of Solar Street Lights (400 Nos) at Lhou and Bongkhar circle in Tawang District 2024-25 RE 01/07/2025 to 03/10/2025 –
34 Supply and Installation of Solar Street Lights (30 Nos) at Seru Toth in Tawang District 2025-26 BE 11/11/2025 –

A. Ongoing Scheme

Sl. No. Name of work Amount (Lakh) Remarks
1 Providing and Installation of Solar Street Lights 28 nos. at Thikshi in Tawang District. 13.00 Work in Progress
2 Providing and Installation of Solar Street Lights 26 nos. at Jhamkhar in Tawang District. 12.00 –
3 Providing and Installation of Solar Street Lights 26 nos. at Sarong in Tawang District. 12.00 –
4 Providing and Installation of Solar Street Lights 20 nos. at Luguthang in Tawang District. 13.00 –

8. Downloads / Important Links

To be updated by APEDA, as required.

9. Any other department-specific information

APEDA, Tawang District, also works to spread awareness about the benefits of renewable energy among the public. The department guides communities on the proper use and maintenance of solar systems so that they work efficiently for a long time.

The department encourages the use of clean and eco-friendly energy to minimise dependence on Conventional power sources. APEDA works closely with local administration, village authorities, and other departments to successfully implement and monitor renewable energy projects in the district.